You designed a controller for a wellsite in Oklahoma. It got certified. It shipped. It worked. Then sales lands a customer in Norway, and someone emails asking what zone your equipment is rated for. Zone? Nobody said anything about zones. Your paperwork says Class I, Division 2.
This happens constantly, and it catches good engineers off guard. The short answer is that the world uses two different systems to describe the same danger. North America mostly uses divisions. Most other countries use zones. They’re not interchangeable, and the translation between them is not as simple as swapping one word for another.
This article walks through both systems in plain language, shows you where they line up, and more importantly — shows you the three places where the translation quietly breaks down. If you’re already past the research stage and need hardware built to one or both standards, our ATEX and Class 1 Div 1 design services page covers that side of it.
Both systems are asking the same question
Before the details, it helps to know that neither system is trying to be clever. Both are asking one question: how often is there enough flammable gas, vapor, or dust in this spot to catch fire?
That’s it. If a place is dangerous all the time, equipment there needs to be built to a higher standard. If it’s only dangerous when something goes wrong like a leaky seal, a failed pump — the standard is a bit lower. If it’s never dangerous, normal equipment is fine. The two systems just slice that question into a different number of pieces.
The NEC division system
In the United States and Canada, hazardous areas are described using the National Electrical Code, usually Articles 500 through 504. This is the division system, and it sorts out a location three ways.
First, what kind of hazard is present.
- Class I — flammable gases or vapors. Think natural gas, propane, gasoline fumes.
- Class II — combustible dust. Grain, flour, coal dust, metal powders.
- Class III — flammable fibers or flyings. Textile lint, sawdust.
Second, how likely the hazard is.
- Division 1 — the hazard is present during normal, everyday operation.
- Division 2 — the hazard is only present if something fails or leaks.
Third, which specific substance.
Class,I split into Groups A, B, C, and D. Group A is acetylene, B is hydrogen, C is ethylene, D is propane and methane. Dust gets Groups E, F, and G. So, a fully classified area sounds like this: Class I, Division 1, Group D. Flammable gas, present normally, propane family. Two divisions. Simple, and that simplicity is both its strength and its problem.
The IEC zone system
Most of the rest of the world like Europe, Australia, much of Asia, South America, follows the IEC 60079 series. In Europe, this gets enforced through the ATEX directive. Instead of two likelihood levels, this system uses three different levels.
- Zone 0 — flammable gas is present continuously, or for long periods. Roughly more than 1,000 hours a year. Inside a fuel tank is a classic example.
- Zone 1 — likely to be present during normal operation. Roughly 10 to 1,000 hours a year.
- Zone 2 — not likely in normal operation, and only for a short time if it happens. Under 10 hours a year.
Dust gets its own set: Zones 20, 21, and 22, following the same logic. That extra level is the whole story. Where North America says “dangerous during normal operation,” the IEC splits that into “dangerous almost always” and “dangerous sometimes.” A tank interior and the area near a pump seal are treated very differently, even though both fall inside Division 1.
Here’s the comparison most engineers are looking for.
| Hazard type | NEC (North America) | IEC / ATEX (International) | Typical example |
| Gas — present continuously | Class I, Division 1 | Zone 0 | Inside a fuel or solvent tank |
| Gas — present in normal operation | Class I, Division 1 | Zone 1 | Around a pump seal or open vent |
| Gas — abnormal conditions only | Class I, Division 2 | Zone 2 | Well-ventilated area near closed piping |
| Dust — present continuously | Class II, Division 1 | Zone 20 | Inside a grain silo or dust collector |
| Dust — present in normal operation | Class II, Division 1 | Zone 21 | Near a bagging or transfer point |
| Dust — abnormal conditions only | Class II, Division 2 | Zone 22 | Outside surfaces near sealed equipment |
Notice the shape of it. One division maps to two zones. Division 1 covers both Zone 0 and Zone 1. Division 2 lines up reasonably well with Zone 2. That asymmetry is where the trouble starts.
If you take a Zone 1 product and bring it to North America, calling it Division 1 is usually defensible. Go the other direction, though, and you have a problem. A product certified for Division 1 was not necessarily built to Zone 0 requirements. Zone 0 demands a higher level of protection. This typically two independent layers of safety, so that two separate faults would have to happen at once before anything ignites. A Division 1 product may only have one.
So, the honest rule is: Division 1 to Zone 1 is often fine. Division 1 to Zone 0 is not automatic and needs to be verified.
Where the translation quietly breaks
Three details trip people up, and the gas group one causes the most damage.
1. The gas groups run backwards.
This is not a joke. The letter and roman-numeral systems are ordered in opposite directions.
| Substance | NEC group | IEC group |
| Acetylene | Group A | IIC |
| Hydrogen | Group B | IIC |
| Ethylene | Group C | IIB |
| Propane, methane | Group D | IIA |
In the NEC, A is the most dangerous. In the IEC, IIC is the most dangerous. So, NEC Group D — the least demanding — becomes IIA, and Group A becomes IIC. If you skim this and assume the letters roughly correspond, you will spec equipment that’s under-rated for the gas it’s sitting in.
2. Temperature codes are close but not identical.
Both systems use T1 through T6 to cap the maximum surface temperature of equipment. T6 is the coolest and strictest at 85°C. The difference is that the NEC adds subdivisions — T2A, T2B, T2C, T2D and so on — while the IEC does not. An IEC T3 is a wider bucket than a specific NEC T3B.
3. The protection method names change.
Same physics, different labels. North America says “explosionproof”; the IEC says “flameproof, Ex d.” North America has “non-incendive” for Division 2; the IEC has “Ex n.” Intrinsic safety is the one that travels well — it’s Ex ia or Ex ib almost everywhere.
Worth knowing: the US actually adopted a parallel zone system years ago, in NEC Articles 505 and 506. It’s legal to classify a US facility using zones. Most operators haven’t switched because their drawings, spare parts, and maintenance crews all speak divisions, but it means the two systems can coexist on the same site.
So, does your product need zone or division rated electronics?
Work through it in this order.
- Where will it actually be installed? Not where it’s designed, not where it’s sold. Where it will physically sit. The local authority in that country sets the rules.
- Who classifies the area? Not you. The facility owner or their engineer classifies the space and hands you a requirement.
- Match the substance, not just the level. Get the gas group and temperature class right, using the reversed table above.
- Decide the certification path early. Building both from the start is much cheaper than retrofitting. Dual certification is common on equipment sold internationally.
- Assume nothing about upgrades. A Division 1 unit is not automatically Zone 0. Verify.
The expensive mistake is almost always the same one: designing the domestic market, then discovering the export requirement after the enclosure, the components, and the layout are locked. At that point you’re not adjusting a design. You’re starting one.
Where this lands in the design
This is why hazardous-location requirements have to be a design input rather than a certification step at the end. Component selection, spacing, enclosure sealing, cable entry, and the entire thermal budget all change depending on which system and which level you’re targeting.
At Pelican Engineering, our engineers have designed Class I, Division 1 and Division 2 systems for hazardous locations, and that work shapes how we approach every board destined for a classified area — it’s part of our broader energy sector engineering services. Design and manufacturing both happen in the same building in Lafayette, Louisiana, so a sealing or spacing decision made during layout gets verified by the people who actually assemble the unit. Our ISO 9001 and IPC-A-610 certifications cover the quality system and workmanship standards behind that build.
One thing we say plainly: formal hazardous-location certification testing is done by an accredited third-party lab, not by us. What we do is design toward the requirement and support your submission so the lab visit isn’t a surprise.
Getting it right the first time
Two systems, one goal: keep an ignition source away from something flammable. They arrive at it differently, and the gaps between them are small enough to miss and expensive enough to matter. If you’re working out which standard applies to a product you’re developing — or you already know and need the electronics built to it — speak with our engineering team. You’ll reach an engineer, not a salesperson, and we’ll tell you honestly whether it’s a fit before anyone quotes anything.